42nd Street NE from Edgewood Road to Wenig Road

Pavement Reconstruction, sidewalk replacement, utility improvements

SUBSCRIBE FOR PROJECT NEWSLETTERS


Tentative Schedule
Design: Spring 2023 – Summer 2024
Right-of-Way Acquisitions: Fall 2023 – Summer 2025
Utility Relocations: Fall 2024 – Fall 2025
Construction Start, Edgewood Road to Pine View Drive: Spring 2025
Construction Start, Pine View Drive to Wenig Road: Spring 2026

Key Contacts
City Project Managers
Lee Tippe
319-286-5816 | l.tippe@cedar-rapids.org
Jennifer Selby
319-286-5622 | j.selby@cedar-rapids.org


Planned Improvements

This project includes the reconstruction of 42nd Street NE from River Ridge Drive to Wenig Road. The existing roadway width will be maintained as the roadway within the project limits is reconstructed. All sidewalks within the project limits will be replaced and ADA curb ramps and crossings will be added at side roads. Two crossings, located east of Blue Jay and near Kennedy baseball field, will have a refuge median and Rectangular Rapid-Flashing Beacon (RRFB). All storm sewer will be replaced and subdrain will be added. A portion of the aging water main will be replaced (Lexington Boulevard to Westchester Drive). Tree removals will be required to install the new storm sewer and sidewalk; new parkway trees will be planted after construction is completed.