HomeLocal GovernmentDepartments G - VPublic WorksEngineering & ConstructionPaving for ProgressPROJECTS > Hampden Dr. NE from Devonshire Dr. to Crandall Dr. Pavement Reconstruction

Public Works

Hampden Drive NE from Devonshire Drive to Crandall Drive Pavement Reconstruction

Project Phase:
Construction
Construction Start: May 2023

Project Background:
The Hampden Drive NE pavement collapsed in several locations in late 2022. The Public Works Streets Division performed limited patching to make the roadway safe for travel and the Public Works Engineering Division fast-tracked a project for full reconstruction. 

Planned Improvements:
This project includes full concrete pavement reconstruction, installation of storm sewer, and bringing existing sidewalk ramps into compliance with ADA requirements.
© 2023  Cedar Rapids, Iowa, 101 First Street SE

Powered By Revize Login