Public Works


**PROCESSING OF PERMITS MAY TAKE UP TO 48 HOURS TO COMPLETE**

General provisions

  • All vehicles operating under permit must carry a copy of the permit in the vehicle and make the permit available upon request of any authorized official.
  • A copy of the General Provisions for Oversize Load Permit must also be carried with the permit. All provisions noted on the permit and general provisions must be followed.
  • General Provisions for Oversize Load Permit

Single trip permit

Annual oversize permit

  • Valid for 12 months, unlimited trips
  • 80,000 pounds gross maximum, 20,000 pounds per  axle maximum
  • Valid on all state and interstate highways
  • Annual Oversize Permit Application

Annual oversize/overweight permit

Truck Route Map

Street Width Map

Iowa DOT website
© 2023  Cedar Rapids, Iowa, 101 First Street SE

Powered By Revize Login